Skip to content
Sources and reuse / Confluence and RovoDownload Markdown

Confluence and Rovo implementation guide

8 min read · 6 reference tables

*AI-generated recommendations for discussion. These are not Nick’s recommendations or approved JLL/PRISM guidance.

Current deployment boundary

The Cloudflare website, live collection and read-only MCP are deployed. This guide remains a plan for importing the dated research into company Confluence; no Confluence/Jira/Rovo publication or ongoing sync has been performed by this project. The 183-entry page manifest describes proposed pages, not existing company pages. Live reviews, source captures and digests need a separate import and refresh decision. Current system.

Purpose

Use this guide to publish the Cove, Visitt and PRISM research package into a company Confluence space as a visual, source-grounded competitive-intelligence knowledge base. Use Jira to assign validation, remediation and ownership work. Use Rovo to draft, summarize, cross-link and query content after the source evidence and page structure are present.

The local package remains the canonical evidence snapshot. In the proposed company rollout, Confluence would hold the team-facing knowledge base, Jira would track validation work, and Rovo would support retrieval and drafting.

Rovo start instructions

Before creating or editing content, read these files in order:

  1. confluence-rovo-import-guide.md
  2. confluence-rovo-page-manifest.json
  3. confluence-rovo-page-template.md
  4. START-HERE.md
  5. knowledge-base/AGENTS.md
  6. The source_files listed for the page being created

Apply these rules:

Expected coverage

The completed space must account for:

Evidence set Required coverage
Documented user flows 58
Cove flows 33
Visitt flows 25
Matched demonstration jobs 14
Connected experience maps 13
Visual assets 1,334
First-party recordings or help-center animations 44
Component families 16
Canonical source URLs 459

Counts describe the September 13, 2026 research snapshot. Public documentation was reviewed; no authenticated customer account was tested.

Build directly in the company Confluence environment beneath a restricted staging parent. Validate a six-page golden set before bulk creation. Import page structure and attachments deterministically from the manifest. Use Rovo after the evidence is attached to add summaries, implications and cross-links.

Rovo should not be the only mechanism used to ingest 1,334 assets. A deterministic importer, Confluence HTML import or Confluence API should create the page hierarchy and upload assets. Rovo should use those stable pages as context.

Required access

The operator needs:

Record these values before execution:

Field Required value
Confluence site <COMPANY_ATLASSIAN_URL>
Space key <COMPANY_CONFLUENCE_SPACE_KEY>
Staging parent ID <STAGING_PARENT_CONTENT_ID>
Jira project key <VALIDATION_PROJECT_KEY>
Space owner <NAME_OR_TEAM>
Reviewers <NAMES_OR_GROUP>
Final audience <SPACE_ROLE_OR_GROUP>

Target page hierarchy

Use the exact hierarchy in confluence-rovo-page-manifest.json. The major branches are:

PRISM Competitive Intelligence — Staging [CI-000]
├── Start here and decision brief [CI-010]
├── Research method, readiness and limitations [CI-020]
├── Market and PRISM strategy [CI-100]
├── Cove product, GTM and user flows [CI-200]
│   └── Cove flow atlas [CI-220]
├── Visitt product, GTM and user flows [CI-300]
│   └── Visitt flow atlas [CI-320]
├── Matched task comparisons [CI-400]
├── Connected experience maps [CI-500]
├── Visual UI intelligence [CI-600]
│   ├── Image diary [CI-620]
│   ├── Component patterns [CI-630]
│   └── Video evidence [CI-640]
├── Sales enablement [CI-700]
├── Evidence, sources and open questions [CI-800]
└── Rovo and agent operations [CI-900]

Golden-set pilot

Create and approve these six pages before starting a bulk batch:

Order Page ID Page
1 CI-000 PRISM Competitive Intelligence — Staging
2 FLOW-COVE-COVE-AMENITY-BOOKING Cove: Reserve an amenity as a tenant
3 FLOW-VISITT-VISITT-AMENITIES Visitt: Configure and manage amenities
4 MATCH-PAIR-08 Room or amenity reservation comparison
5 DIARY-COVE-AMENITIES Cove amenities image diary
6 CI-710 PRISM competitive sales playbook

Parent prerequisite: after creating CI-000, create these ancestor pages in order as clearly labeled navigation shells: CI-200 (Cove product, GTM and user flows), CI-220 (Cove flow atlas), CI-300 (Visitt product, GTM and user flows), CI-320 (Visitt flow atlas), CI-400 (Matched task comparisons), CI-600 (Visual UI intelligence), CI-620 (Cove and Visitt image diary), CI-700 (Sales enablement). Save their Confluence content IDs before creating the five substantive pilot pages beneath them. These shells are navigation prerequisites, not additional reviewed pilot content. Do not mark a shell complete as an evidence page.

The pilot is approved only when:

Batch execution plan

Execute batches in order. Complete the verification gate before starting the next batch.

Batch Scope Inputs Gate
B0 Access and staging setup This guide; target fields Staging parent exists and is restricted to reviewers
B1 Golden set Six pilot manifest entries Pilot approved
B2 Core strategy and readiness Brief, analysis, review, GTM, wedge, messaging and readiness files All claims retain evidence status and limitations
B3 Cove flows 33 Cove flow entries and related assets 33/33 pages; asset totals match manifest
B4 Visitt flows 25 Visitt flow entries and related assets 25/25 pages; asset totals match manifest
B5 Matched jobs 14 comparison entries 14/14 pages; both vendors represented
B6 Experience maps 13 journey entries 13/13 pages; every referenced flow link resolves
B7 Visual library Image diary, 16 component families and video index 1,334/1,334 assets accounted for; 44/44 video or animation references indexed
B8 Sales, evidence and agent operations Sales pages, claim register, gaps, sources and agent instructions Required pages approved by product and sales reviewers
B9 Publication Verification report and resolved Jira blockers Final parent and permissions approved; staging label removed

Page creation procedure

For each manifest entry:

  1. Resolve the parent_id to the already-created Confluence parent page.
  2. Create a draft page with the exact title and page_id.
  3. Read every path in source_files.
  4. Upload every path in asset_files and preserve the listed order.
  5. Render the sections required by confluence-rovo-page-template.md.
  6. Add each URL in source_urls as an evidence link.
  7. Apply all labels from the manifest.
  8. Add source_snapshot, evidence_status and last_reviewed metadata.
  9. Run the page-level verification prompt.
  10. Record the resulting Confluence content ID and URL in the manifest copy used for execution.
  11. Publish only when verification_status is passed and no blocking Jira item remains.

Visual evidence rules

Rovo page-drafting prompt

Use this prompt once the page shell and attachments exist:

Create or complete the Confluence page identified by PAGE_ID using the attached manifest entry, page template and source files. Preserve the exact title, parent, labels, asset order, source URLs, evidence notes and remaining-validation questions. Describe only what the cited evidence supports. Put recommendations in the PRISM opportunity section and label them as hypotheses. If an input is missing or contradictory, stop, list the blocking item and propose a Jira validation ticket. Do not publish the page until the page-level verification checklist passes.

Rovo flow-page prompt

Build the flow page for FLOW_ID. State the user goal, actor, documented entry surface, ordered stages, decisions, system behavior, outputs, exceptions and unknowns. Embed every manifest asset in order with a source-grounded caption. Link the related journey, matched comparison and source pages. Separate documented behavior from analytical reconstruction and PRISM recommendations.

Rovo matched-comparison prompt

Build the matched comparison for MATCH_ID. Use the named Cove and Visitt flow pages. Compare the same configured job across actors, steps, decisions, handoffs, automation, visibility, exceptions and evidence strength. Include side-by-side visual sequences. Do not use missing evidence as a negative capability claim. End with PRISM demo requirements, discovery questions and validation blockers.

Rovo image-diary prompt

Build the image diary for DIARY_ID. Group the manifest assets by source page and task while preserving source order. Show the original image or GIF, its stable asset ID, caption, source, capture date, role, application area and related flows. Add a short observation describing visible interface behavior. Do not infer hidden interactions from a still image.

Rovo verification prompt

Verify PAGE_ID against its manifest entry and page template. Return JSON with page_id, parent_match, title_match, source_files_present, asset_count_expected, asset_count_found, missing_asset_ids, source_url_count_expected, source_url_count_found, required_sections_present, labels_present, unsupported_claims, unresolved_questions, verification_status and blocking_reasons. Set verification_status to passed only when every required field and asset is present and no unsupported claim remains.

Jira validation workflow

Create a Jira work item when a page has a missing asset, broken source, contradictory evidence, uncertain product behavior, unverified PRISM claim or permission problem.

Use this issue format:

Jira field Value
Summary [CI validation] PAGE_ID — concise blocker
Issue type Task or the company-approved validation type
Component Competitive Intelligence
Labels prism-ci, confluence-import, page company, page type
Description Page URL, manifest entry, evidence gap, expected result, acceptance test and owner
Priority Based on decision impact, not page order
Link Confluence staging page and source record

Do not resolve a validation issue solely because Rovo generated plausible prose. Resolve it when the cited evidence, product test or responsible owner satisfies the acceptance test.

Verification dashboard

Maintain a Confluence verification page sourced from the execution copy of the manifest. Report:

Required completion gates:

flows: 58/58
cove_flows: 33/33
visitt_flows: 25/25
matched_jobs: 14/14
journeys: 13/13
visual_assets_accounted_for: 1334/1334
video_or_animation_references: 44/44
component_families: 16/16
broken_internal_links: 0
blocking_validation_items: 0

Review responsibilities

Reviewer Required review
Competitive-intelligence owner Hierarchy, attribution, completeness and source fidelity
Product representative PRISM capability statements, feasibility and configuration status
Sales representative Messaging, discovery questions, objections and demo usefulness
Research reviewer Evidence status, counterevidence, dates and limitations
Confluence space owner Permissions, navigation, labels and publication state

Review every executive recommendation, sales claim and matched comparison. For the visual batches, compare page counts and assets automatically, then spot-check each source sequence against the local package.

Publication and rollback

Definition of done

The migration is complete when:

Official Atlassian references

Features, permissions and administrative controls can change. Confirm company settings and the linked Atlassian documentation before execution.